Started a model of the DH Gipsy Moth a last week. It's 1/48th scale by A model, a bit rough around the edges.
Having looked at the construction I decided to build it in sections, this would not only allow for an easier 'air- brushing' job with little masking required but also the individual assemblies such as the cowlings can be cleaned up once assembled. Check that various items, such as the motor, can be inserted afterwards.
I'll bring it along on Wednesday.