Back from a short break with Mrs Haddock. Been sloshing some paint on, the pictures probably speak for themselves.
Nothing glued in place as yet.
The last photo is an examlpe of why things take so long.
These are the ladders that get you from the main deck up to the bridge deck,one each side.
As you can see, you bend parts PE-A1 and PE-A6 as shown in the diagram, then add the handrails, PE-A26 and PE-A27
bent as shown, pop the lot into position on the sides of the bridge structure, job jobbed.
Trouble is that the upper ladder won't bend far enough to reach the bridge deck because of the way the brass is designed
so the whole lot is useless.
I've come up with a solution which I'll post when comlete.
Haddock.
(Brassed off)