Bridlington & Wolds Scale Model Club Forum
Models => Modelling Projects => Topic started by: zak on August 24, 2020, 01:36:38 PM
-
I still have to decide on a particular structure for this as yet, but it will be connected to the coal lorry I hope.
-
Is this you being enigmatic ???/ or is it the old song knee bone connected to the leg bone ??????
-
Is this you being enigmatic ???/ or is it the old song knee bone connected to the leg bone ??????
Enthusiasm, I knew that I needed something to go with the truck, and then be part of something much larger, if my interest goes that far.
-
Started!
-
Progress. I lowered the slope on the roof.
Bricklaying.
-
This horrible weather allows more modelling to be done, too wet for gardening and so on.
-
Bricklaying completed, now to paint and point.
-
Should we tell "Boris the %$$%$" about you - you could single handed sort out the housing shortage in about 3 weeks - hohohohoho
-
Should we tell "Boris the %$$%$" about you - you could single handed sort out the housing shortage in about 3 weeks - hohohohoho
Nice idea Msea,
But we would have to be about 2" tall.
Bigkev
-
Would there be enough Corn-flake packets?
-
Would there be enough Corn-flake packets?
Fruit and Fibre please!
-
Would there be enough Corn-flake packets?
Fruit and Fibre please!
What about the rain forest and the toilet roll shortage???
Cheers,
Bigkev
-
Should we tell "Boris the %$$%$" about you - you could single handed sort out the housing shortage in about 3 weeks - hohohohoho
That long!
-
Pointing completed, bricks painted roof in progress, doors scribed.
The second picture is for Kevin.
-
It's that spy again.
-
Good pointing Zak...
Andy.
-
You need to give him a little moustache then he'll look like Private Walker from Dad's Army.
-
Doors painted, still need to add gutters, barge and facia boards and paint the roof, not forgetting the door handles.
Sorry fellow modellers i seem to have slowed down somewhat.
I have started another building, this is based on the station building at Chelfham on the Lynton & Barnstaple railway, finished in brick rather than stone.
-
Slowed down - you mean only 3 models finished per day instead of the normal 7 - hohohoho - they all look great whatever speed you go.
-
Brickwork painted.
It is a slow job.
-
they look good.
-
They look life like
-
Brickwork painted.
It is a slow job.
Hi Zak,
I've seen some of those builders.
Try cutting a teabreak (or two) out of you building regime and you might get back on track....
Joking.......
Bigkev
-
Brick work is magic. I'm nor surprised it took a while.
-
Roofing, windows and doors.
-
Do you do your building whilst listening to LOUD music, shirt off and shorts half down...
Looking good,
Andy.
-
Thanks Andy - now I am trying to get that image out of my head :-[ :-\ :'( >:( >:( >:( >:(
-
Do you do your building whilst listening to LOUD music, shirt off and shorts half down...
Looking good,
Andy.
Of course, and a builders tea as well.
-
The image just got worse >:( >:( >:( >:( >:( >:( >:( :'(
-
Hmmm...
-
The problem is we've all got that image in our heads now!!!!
-
Almost complete, still need to add some down pipes and weather the roof.
Flash Harry instructs one of his workers on how to shovel something?
-
He gets everywhere.
-
That looks like a loco fireman's shovel. Either that or it's a big horse!!!
-
That looks like a loco fireman's shovel. Either that or it's a big horse!!!
Correct, it for shovelling coal.
-
Words fail again!
Looks great!